Productivity

LM123 Microsoft Project 2016 Essentials (LM123)


Content
  • Introduction and "Know How" to Tackle This Course
  • LM123.1 Working with Project
  • LM123.1.1 Using the Ribbon.mp4
  • LM123.1.2 Navigating the Backstage View.mp4
  • LM123.1.3 Finding Commands.mp4
  • Feedback - LM123.1
  • lm123.2 setting up project files
  • LM123.2.1 Creating and Saving Projects.mp4
  • LM123.2.2 Creating a Project from a Template.mp4
  • LM123.2.3 Creating a Project from an Excel Workbook.mp4
  • LM123.2.4 Setting up Calendars.mp4
  • LM123.2.5 Defining Working and Non-Working Time.mp4
  • LM123.2.6 Setting Basic Options.mp4
  • Feedback - LM123.2
  • lm123.3 creating tasks
  • LM123.3.1 Understanding Manual and Automatic Scheduling .mp4
  • LM123.3.2 Creating a Manual Task.mp4
  • LM123.3.3 Creating an Autoscheduled Task.mp4
  • LM123.3.4 Switching Between Manual and Automatic Scheduling.mp4
  • LM123.3.5 Creating a Milestone Mark.mp4
  • LM123.3.6 Creating a Recurring Task.mp4
  • LM123.3.7 Copying Tasks from Another Program.mp4
  • LM123.3.8 Creating a Summary Task.mp4
  • LM123.3.9 Displaying Summary Tasks.mp4
  • LM123.3.10 Organising Tasks in a Task List.mp4
  • LM123.3.11 Working with Work Breakdown Structure Codes.mp4
  • Feedback - LM123.3
  • lm123.4 linking and timing tasks
  • LM123.4.1 Linking Tasks.mp4
  • LM123.4.2 Adding Lag or Lead Time.mp4
  • LM123.4.3 Setting Task Date Constraints.mp4
  • LM123.4.4 Viewing Tasks and Task Links.mp4
  • Feedback - LM123.4
  • lm123.5 creating resources
  • LM123.5.1 Understanding Resources.mp4
  • LM123.5.2 Creating a Work Resource .mp4
  • LM123.5.3 Creating a Material Resource.mp4
  • LM123.5.4 Setting up Costs for Work and Material Resources.mp4
  • LM123.5.5 Creating a Cost Resource.mp4
  • Feedback - LM123.5
  • LM123.6 assigning tasks to resources
  • LM123.6.1 Understanding Duration Work and Units.mp4
  • LM123.6.2 Assigning Resources to Tasks.mp4
  • LM123.6.3 Using Team Planner to Assign Resources.mp4
  • LM123.6.4 Finding Overallocations.mp4
  • LM123.6.5 Assigning Resources with Effort-Driven and Non-Effort-Driven [...].mp4
  • LM123.6.6 Modifying Resource Assignments.mp4
  • LM123.6.7 Replacing Resources on a Task.mp4
  • Feedback - LM123.6
  • LM123.7 working with views
  • LM123.7.1 Choosing a View.mp4
  • LM123.7.2 Working with a Table.mp4
  • LM123.7.3 Inserting and Rearranging Table Columns.mp4
  • LM123.7.4 Changing the Settings for Columns in a Table.mp4
  • LM123.7.5 Displaying Two Views at the Same Time.mp4
  • LM123.7.6 Using the Timeline View.mp4
  • LM123.7.8 Grouping Tasks and Resources.mp4
  • LM123.7.9 Filtering Tasks and Resources.mp4
  • LM123.7.10 Modifying Task Bar Styles and Task Bar Text.mp4
  • LM123.7.11 Modifying Task Bar Layout.mp4
  • LM123.7.12 Modifying Text Formatting.mp4
  • Feedback - LM123.7
  • lm123.8 fine-tuning the project schedule
  • LM123.8.1 Reviewing the Critical Path.mp4
  • LM123.8.2 Using the Task Inspector to Review Scheduling Issues.mp4
  • LM123.8.3 Splitting a Task.mp4
  • LM123.8.4 Delaying a Task or Assignment.mp4
  • LM123.8.5 Adjusting a Work Contour.mp4
  • LM123.8.6 Leveling Resources.mp4
  • LM123.8.7 Inactivating a Task.mp4
  • Feedback - LM123.8
  • lm123.9 tracking and managing a project
  • LM123.9.1 Understanding Baseline Schedule and Actual Values.mp4
  • LM123.9.2 Saving and Clearing a Baseline.mp4
  • LM123.9.3 Adding Tasks to a Baseline.mp4
  • LM123.9.4 Updating the Schedule.mp4
  • LM123.9.5 Assigning Overtime.mp4
  • LM123.9.6 Updating Costs.mp4
  • LM123.9.7 Rescheduling Unfinished Work.mp4
  • Feedback - LM123.9
  • lm123.10 viewing and reporting project information
  • LM123.10.1 Viewing Project Schedule Status.mp4
  • LM123.10.2 Looking for Schedule Progress Problems.mp4
  • LM123.10.3 Looking for Cost Problems.mp4
  • LM123.10.4 Working with Graphical Reports.mp4
  • LM123.10.5 Using Earned Value.mp4
  • LM123.10.6 Printing Views and Reports.mp4
  • Feedback - LM123.10
  • lm123.11 Sharing Projects
  • LM123.11.1 Saving to Other Formats.mp4
  • LM123.11.2 Working with the Global Template.mp4
  • LM123.11.3 Importing and Exporting.mp4
  • LM123.11.4 Sharing Project Information in Other Ways.mp4
  • Course Feedback
Completion rules
  • All units must be completed
  • Leads to a certificate with a duration: Forever